Raser To Switch On Low Temp Geothermal Power
Raser Technologies is set to open its first low-temp geothermal plant in Utah. The company has so far made good on its promise to build geothermal plants in record time — it typically takes up to five years, and Raser has done it in less than one. The 10-megawatt plant pulls together 50 small units to tap into a small sliver of 120,000 megawatts of low- and medium-temperature geothermal resources cataloged by the National Renewable Energy Laboratory and U.S. Geological Survey.
Read more about this here.
